Finnegan Construction Group LLC remodels kitchens in Washington DC and Maryland. We handle full gut renovations, layout changes, and updates to cabinets, counters, and fixtures. We move plumbing, gas lines, and electrical when the new layout needs it. A lot of our kitchens are in older DC rowhouses, where opening walls and rerouting lines takes some planning.
You do not need to have it all figured out. We can help with the layout and design, or just help you brainstorm ideas.
How a Kitchen Remodel Works
- Site visit and quote. We look at the space, talk through what you want, and send you a quote.
- Layout and design. If you have a plan, we build it. If you do not, we help you work out the layout and talk through ideas.
- Selections. You pick cabinets, counters, tile, and fixtures. We order early so nothing holds up the job.
- Permits. If the work moves plumbing, gas, electrical, or walls, it needs a permit. We get it before we start.
- Demo. We tear out the old kitchen and protect the rest of the house.
- Rough-in. Framing, plumbing, gas, and electrical go in, then get inspected.
- Walls and floors. Drywall, patching, and flooring.
- Cabinets and counters. Cabinets go in first. Counters get measured off the installed cabinets, then installed.
- Finish. Backsplash, fixtures, appliances, paint, and a final walkthrough with you.
Kitchen Remodeling FAQ
How much does it cost to remodel a kitchen in DC?It depends on what you change. The biggest swings come from moving plumbing, gas, or walls, and from the cabinets and counters you pick. Older DC rowhouses can also turn up surprises once walls are open. We price each job after a site visit so the number is real.
Is $30,000 enough for a kitchen remodel?It can be if you keep the same layout and replace cabinets, counters, and fixtures. If you are moving the sink or stove, taking out walls, or gutting the room, plan on more.
What is the most expensive part of a kitchen remodel?Usually cabinets. After that, it is moving things. Relocating plumbing, gas, or electrical, or removing a wall, adds labor, permits, and inspections.
What is the 30% rule in remodeling?It is a rough guideline that says not to spend more than about 30% of your home’s current value on renovations, so you do not put more into the house than it is worth. It is based on what the house is worth now, not the ARV. ARV means after repair value, which is what the house will be worth once the work is done. The two numbers can be very different. If your house is worth $100,000 today and you spend $30,000, that is 30% of the current value. If the work makes the house worth $200,000, that same $30,000 is only 15% of the ARV. It is a starting point, not a hard rule. We help you figure out what makes sense for your house and your budget.
What is the correct order for a kitchen remodel?Plan and pick your materials, get permits, demo, rough-in plumbing, gas, and electrical, pass inspection, then drywall, flooring, cabinets, counters, backsplash, and fixtures. The steps above walk through it.
What are the biggest kitchen remodel mistakes?Ordering cabinets and counters too late, changing the layout after work starts, skipping permits, and not leaving room in the budget for what is behind the walls in an older house.
Get a Quote
Ready to talk about your kitchen? Request a quote or call (202) 695-9533. We also do home additions, underpinning, and basement waterproofing.